              PROJECT        : Interpretation de l'essai de pompage au 
              =======


              SCOPE          : RESULTS OF FULL-SCALE PERMEABILITY TESTS
              TEST DATE      : 7/6/2005    
              WELL NUMBER    : PS-53       

    1. MODEL INPUT SUMMARY
       ----- ----- -------
    MODEL DOMAIN             : THICKNESS =   7.019 m 
                             : ESTIMATED HORIZONTAL PERMEABILITY =.168E-09 m^2 
                             : ESTIMATED ANISOTROPY RATIO =   3.00
    WELL DEPTH (HANTUSH d)   : TOP OF SCREEN =    2.50 m 
    WELL DEPTH (HANTUSH l)   : BOTTOM OF SCREEN =    4.00 m 
    WELL RADIUS              : EFFECTIVE RADIUS =     .20 m 
    AIR FLOW DIRECTION       : VAPOR EXTRACTION

    2. MODEL OUTPUT SUMMARY
       ----- ------ -------

******************************************************************************

  AIR    SOIL       ATMOS.    SYSTEM   FLOW      SCALE     PREVAIL.   ACTUAL
  TEMP   TEMP       PRESS.    PRESS.   METER    READING     FLOW      FLOW
  degC   degC       "H2O      "H2O     TYPE       --        kg/sec    kg/sec

******************************************************************************

  20.00   8.00     401.217      .000   NONE       --          --       .017

******************************************************************************


******************************************************************************

   MASS      HORIZON.   VERTICAL   LEAKAGE     ANISOTPY  MEAN OF     STD DEV
   FLOW      PERM.      PERM.     RATIO(k/b)   RATIO     ERROR IN    OF ERROR
  kg/sec     m^2        m^2        m^2 /m      (kr/kz)   PRESS.      IN PRESS.

******************************************************************************

     .017   .236E-11   .198E-10   .000E+00      .119    .140E-02    .105E-01

******************************************************************************

